- Troubleshoot SV-BP-01
- Troubleshoot PV-HE-01 reed
- Troubleshoot PV-FU-02 reed
- Add actuator relay
- Add new AI line for TC and check
- Install BB emergency depress line
- Reinstall all ducers
- Install BB depress system
- Checkout QD solenoids
- Reinstall QDs
- Install injector
- Drill struts for avi box
- BB test
- LN2 cryo test for TCs w/ slope
- Troubleshoot PI connection issue w/ router