Skip to content

Backport #88668 to 25.9: wrap ~PooledConnection in try-catch#88734

Merged
mstetsyuk merged 1 commit into25.9from
backport/25.9/88668
Oct 27, 2025
Merged

Backport #88668 to 25.9: wrap ~PooledConnection in try-catch#88734
mstetsyuk merged 1 commit into25.9from
backport/25.9/88668

Conversation

@robot-ch-test-poll2
Copy link
Contributor

Original pull-request #88668
Cherry-pick pull-request #88733

This pull-request is a last step of an automated backporting.
Treat it as a standard pull-request: look at the checks and resolve conflicts.
Merge it only if you intend to backport changes to the target branch, otherwise just close it.

The PR source

The PR is created in the CI job

@robot-ch-test-poll2 robot-ch-test-poll2 added pr-backport Changes, backported to release branch. Do not use manually - automated use only! pr-critical-bugfix labels Oct 17, 2025
@clickhouse-gh
Copy link
Contributor

clickhouse-gh bot commented Oct 17, 2025

Workflow [BackportPR], commit [cf33ae4]

@mstetsyuk mstetsyuk merged commit 97ab9c8 into 25.9 Oct 27, 2025
30 of 35 checks passed
@mstetsyuk mstetsyuk deleted the backport/25.9/88668 branch October 27, 2025 19:41
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

pr-backport Changes, backported to release branch. Do not use manually - automated use only! pr-critical-bugfix

Projects

None yet

Development

Successfully merging this pull request may close these issues.

4 participants