Scheduled -
We will be conducting routine database patching at our Colombia data center.
During this process, you may experience brief disruptions in the operation of services corresponding to the components listed below.
The disruption may occur during a specific database restart, but each restart should take no longer than a few minutes, with a maximum duration of 10 minutes. Furthermore, since components are isolated within their own databases, there will be no simultaneous disruption to multiple components.
This patching is essential to keep our databases up-to-date and ensure they operate at peak performance.
Start (UTC): 17 March 2026 07:00
End (UTC): 17 March 2026 10:00
Purpose: Database patching and maintenance
Mar 03, 2026 - 15:03 UTC
We will be performing planned maintenance at our Global (Europe) data center to upgrade core networking equipment, ensuring stability and optimal performance.
Preventive measures are in place to minimize impact; however, brief connectivity interruptions may occur for services hosted at the Global (Europe) data center. Any disruptions are expected to last no longer than a total of 15 minutes within the scheduled maintenance window.
Start (UTC): 17 March 2026 19:00
End (UTC): 17 March 2026 21:00
Purpose: Network infrastructure upgrade and optimization
Posted on
Feb 19, 2026 - 13:33 UTC
Update -
We will be undergoing scheduled maintenance during this time.
Mar 04, 2026 - 14:22 UTC
Scheduled -
We will continue conducting routine database patching at our Colombia data center.
During this process, you may experience brief disruptions in the operation of services corresponding to the components listed below.
The disruption may occur during a specific database restart, but each restart should take no longer than a few minutes, with a maximum duration of 10 minutes. Furthermore, since components are isolated within their own databases, there will be no simultaneous disruption to multiple components.
This patching is essential to keep our databases up-to-date and ensure they operate at peak performance.
Start (UTC): 18 March 2026 08:00
End (UTC): 18 March 2026 11:00
Purpose: Database patching and maintenance
Mar 04, 2026 - 14:20 UTC
We will be performing planned maintenance at our Global (Europe) data center to upgrade core networking equipment, ensuring stability and optimal performance.
Preventive measures are in place to minimize impact; however, intermittent connectivity interruptions may occur for services hosted at the Global (Europe) data center. Any disruptions are expected to last no longer than a total of 15 minutes within the scheduled maintenance window.
Start (UTC): 18 March 2026 20:00
End (UTC): 19 March 2026 00:00
Posted on
Mar 02, 2026 - 12:18 UTC
We will continue conducting routine database patching at our Colombia data center.
During this process, you may experience brief disruptions in the operation of services corresponding to the components listed below.
The disruption may occur during a specific database restart, but each restart should take no longer than a few minutes, with a maximum duration of 10 minutes. Furthermore, since components are isolated within their own databases, there will be no simultaneous disruption to multiple components.
This patching is essential to keep our databases up-to-date and ensure they operate at peak performance.
Start (UTC): 18 March 2026 21:00
End (UTC): 19 March 2026 00:00
Purpose: Database patching and maintenance
Posted on
Mar 04, 2026 - 14:33 UTC
We will be conducting a performance test on the Europe (Global) data center.
The purpose of this test is to assess and improve the efficiency of our systems. We have taken careful measures to minimize any potential impact on our clients’ experience, and we expect that the majority of clients will not notice any disruption. That said, there is a small possibility of intermittent processing issues during the test window.
Start (UTC): 31 March 2026 08:00
End (UTC): 31 March 2026 12:00
Purpose: Ensuring the availability of client services.