TYBO Contracting Ltd. https://tybo.ca/ Building a legacy in your community Fri, 23 Jan 2026 23:55:32 +0000 en-US hourly 1 https://wordpress.org/?v=6.9.4 https://tybo.ca/wp-content/uploads/2021/05/cropped-favicon-32x32.png TYBO Contracting Ltd. https://tybo.ca/ 32 32 Smith Campus Civil https://tybo.ca/smith-campus-civil/ Fri, 23 Jan 2026 23:55:32 +0000 https://tybo.ca/?p=31683 Project Name: Smith Campus Civil Project Location: Langley Client: Turner Construction Scope: Bulk & trench excavation for utilities, retaining walls, foundations & associated site works. Supply, install, maintain & remove temporary & permanent shoring systems for excavation, protection of adjacent structures & services. Engineered trench boxes, soldier piles, lagging, temporary earth support systems & dewatering. […]

The post Smith Campus Civil appeared first on TYBO Contracting Ltd..

]]>
Project Name: Smith Campus Civil
Project Location: Langley
Client: Turner Construction
Scope: Bulk & trench excavation for utilities, retaining walls, foundations & associated site works. Supply, install, maintain & remove temporary & permanent shoring systems for excavation, protection of adjacent structures & services. Engineered trench boxes, soldier piles, lagging, temporary earth support systems & dewatering. Backfilling, compaction & reinstatement of site

The post Smith Campus Civil appeared first on TYBO Contracting Ltd..

]]>
20th Avenue Overpass https://tybo.ca/20th-avenue-overpass/ Fri, 23 Jan 2026 23:53:48 +0000 https://tybo.ca/?p=31681 Project Name: 20th Avenue Overpass Project Location: Surrey Client: City of Surrey Scope: Traffic control, ESC, road construction & realignment, watermain, drainage improvements, ditching, retaining walls, bridge construction, highway improvements, electrical, concrete sidewalk, multi-use path, topsoil, hydroseed, landscaping & surface restoration

The post 20th Avenue Overpass appeared first on TYBO Contracting Ltd..

]]>
Project Name: 20th Avenue Overpass
Project Location: Surrey
Client: City of Surrey
Scope: Traffic control, ESC, road construction & realignment, watermain, drainage improvements, ditching, retaining walls, bridge construction, highway improvements, electrical, concrete sidewalk, multi-use path, topsoil, hydroseed, landscaping & surface restoration

The post 20th Avenue Overpass appeared first on TYBO Contracting Ltd..

]]>
Beacon House Excavation & Off-Site Services https://tybo.ca/beacon-house-excavation-off-site-services/ Fri, 23 Jan 2026 23:51:36 +0000 https://tybo.ca/?p=31679 Project Name: Beacon House Excavation & Off-Site Services Project Location: Delta Client: Polygon Scope: Clearing & grubbing, ESC with tanks & treatment, Bulk excavation, shoring – pipe piles & #7 bars & 100mm shotcrete walls, detailed excavation, structural & mechanical. Detailed backfilling, slab preparation, onsite storm detention tank, water chamber & sanitary connection, storm mains, […]

The post Beacon House Excavation & Off-Site Services appeared first on TYBO Contracting Ltd..

]]>
Project Name: Beacon House Excavation & Off-Site Services
Project Location: Delta
Client: Polygon
Scope: Clearing & grubbing, ESC with tanks & treatment, Bulk excavation, shoring – pipe piles & #7 bars & 100mm shotcrete walls, detailed excavation, structural & mechanical. Detailed backfilling, slab preparation, onsite storm detention tank, water chamber & sanitary connection, storm mains, service connections, water connections & hydrants, Hydro, TELUS & Shaw. Streetlighting, full scope roadworks & landscaping

The post Beacon House Excavation & Off-Site Services appeared first on TYBO Contracting Ltd..

]]>
YVR – Emergency Pavement & Drainage Rehab Apron IV https://tybo.ca/yvr-emergency-pavement-drainage-rehab-apron-iv/ Mon, 01 Dec 2025 16:35:03 +0000 https://tybo.ca/?p=30357 Project Name: YVR – Emergency Pavement & Drainage Rehab Apron IV Project Location: YVR – Richmond Client: Vancouver Airport Authority Duration: 6 weeks Scope: Mobilization (Survey, ESC, Prelocates). Works outside wingtip clearance (removals, excavation, manhole construction, base lift asphalt, mill & overlay). Work within wingtip clearance (night and weekend closures for removals, excavation, tie-ins, asphalt, […]

The post YVR – Emergency Pavement & Drainage Rehab Apron IV appeared first on TYBO Contracting Ltd..

]]>
Project Name: YVR – Emergency Pavement & Drainage Rehab Apron IV
Project Location: YVR – Richmond
Client: Vancouver Airport Authority
Duration: 6 weeks
Scope: Mobilization (Survey, ESC, Prelocates). Works outside wingtip clearance (removals, excavation, manhole construction, base lift asphalt, mill & overlay). Work within wingtip clearance (night and weekend closures for removals, excavation, tie-ins, asphalt, joint sealing, markings). Demobilization & Clean up

The post YVR – Emergency Pavement & Drainage Rehab Apron IV appeared first on TYBO Contracting Ltd..

]]>
Purolator Civil Site Services https://tybo.ca/purolator-civil-site-services/ Tue, 29 Jul 2025 21:18:44 +0000 https://tybo.ca/?p=25975 Project Name: Purolator Civil Site Services Project Location: Coquitlam Client: Beedie Construction Duration: 4 months Scope: The project scope includes onsite and offsite civil works, mechanical and electrical excavation, slab preparation, backfilling, subbase preparation for landscaping, as well as paving and hardscape installation

The post Purolator Civil Site Services appeared first on TYBO Contracting Ltd..

]]>
Project Name: Purolator Civil Site Services
Project Location: Coquitlam
Client: Beedie Construction
Duration: 4 months
Scope: The project scope includes onsite and offsite civil works, mechanical and electrical excavation, slab preparation, backfilling, subbase preparation for landscaping, as well as paving and hardscape installation

The post Purolator Civil Site Services appeared first on TYBO Contracting Ltd..

]]>
DP World – Fraser Surrey Truck Gate https://tybo.ca/dp-world-fraser-surrey-truck-gate/ Tue, 29 Jul 2025 21:16:55 +0000 https://tybo.ca/?p=25973 Project Name: DP World – Fraser Surrey Truck Gate Project Location: Surrey Client: DP World Fraser Surrey Inc Duration: 4 Months Scope: Demolition of existing gate infrastructure, construction of a new container truck gate, installation of civil, electrical, and security systems, coordination with owner-supplied equipment such as Camco and modular buildings and phased execution to […]

The post DP World – Fraser Surrey Truck Gate appeared first on TYBO Contracting Ltd..

]]>
Project Name: DP World – Fraser Surrey Truck Gate
Project Location: Surrey
Client: DP World Fraser Surrey Inc
Duration: 4 Months
Scope: Demolition of existing gate infrastructure, construction of a new container truck gate, installation of civil, electrical, and security systems, coordination with owner-supplied equipment such as Camco and modular buildings and phased execution to maintain terminal operations.

The post DP World – Fraser Surrey Truck Gate appeared first on TYBO Contracting Ltd..

]]>
Smith Campus https://tybo.ca/smith-campus/ Mon, 02 Jun 2025 15:33:59 +0000 https://tybo.ca/?p=23687 Project Name: Smith CampusProject Location: LangleyClient: Turner Construction CompanyDuration: 4 monthsScope: Site Stripping & Clay (Disposed Offsite), import fill, site setup, site maintenance, street sweeping, ESC, dewatering.

The post Smith Campus appeared first on TYBO Contracting Ltd..

]]>
Project Name: Smith Campus
Project Location: Langley
Client: Turner Construction Company
Duration: 4 months
Scope: Site Stripping & Clay (Disposed Offsite), import fill, site setup, site maintenance, street sweeping, ESC, dewatering.

The post Smith Campus appeared first on TYBO Contracting Ltd..

]]>
72 Ave Arterial Widening 188 to 196 https://tybo.ca/72-ave-arterial-widening-188-to-196-2/ Mon, 02 Jun 2025 15:31:50 +0000 https://tybo.ca/?p=23685 Project Name: 72 Ave Arterial Widening 188 to 196Project Location: SurreyClient: City of SurreyDuration: 1 yearScope: 1700m roadworks along 72 Ave and side streets, including excavation, asphalt paving, markings, signage, granular materials, pedestrian signal, traffic signals, drainage works, parking pockets, and approximately100m of new storm sewer with service connections transfers, and approximately 450m of new […]

The post 72 Ave Arterial Widening 188 to 196 appeared first on TYBO Contracting Ltd..

]]>
Project Name: 72 Ave Arterial Widening 188 to 196
Project Location: Surrey
Client: City of Surrey
Duration: 1 year
Scope: 1700m roadworks along 72 Ave and side streets, including excavation, asphalt paving, markings, signage, granular materials, pedestrian signal, traffic signals, drainage works, parking pockets, and approximately100m of new storm sewer with service connections transfers, and approximately 450m of new watermain with service connections transfers

The post 72 Ave Arterial Widening 188 to 196 appeared first on TYBO Contracting Ltd..

]]>
Brookswood Firehall Offsite TP3 https://tybo.ca/brookswood-firehall-offsite-tp3/ Thu, 01 May 2025 15:47:11 +0000 https://tybo.ca/?p=22550 Project Location: Langley Client: Kinetic Duration: 5 months Scope: ESC, Roadworks onsite, building earthworks, Utilities (storm, sani, water) BC Hydro works, Roadworks (27th ave and 200th street) Landscape works and traffic signals

The post Brookswood Firehall Offsite TP3 appeared first on TYBO Contracting Ltd..

]]>
Project Location: Langley
Client: Kinetic
Duration: 5 months
Scope: ESC, Roadworks onsite, building earthworks, Utilities (storm, sani, water) BC Hydro works, Roadworks (27th ave and 200th street) Landscape works and traffic signals

The post Brookswood Firehall Offsite TP3 appeared first on TYBO Contracting Ltd..

]]>
LSAP Early Works Earthworks and Utilities https://tybo.ca/lsap-early-works-earthworks-and-utilities/ Thu, 01 May 2025 15:45:51 +0000 https://tybo.ca/?p=22547 Project Name: LSAP Early Works Earthworks and Utilities Project Location: Langley Client: Smith Brothers Wright Duration: 12 months Scope: ESC, Strip topsoil and overburden, Asphalt parking lot, bulk excavation and backfill, Detail excavation and backfill, building area slab (gravel base, interior turf), indoor turf sub-base, building trenching/bedding and backfill, site utilities (storm, sani, water)

The post LSAP Early Works Earthworks and Utilities appeared first on TYBO Contracting Ltd..

]]>
Project Name: LSAP Early Works Earthworks and Utilities
Project Location: Langley
Client: Smith Brothers Wright
Duration: 12 months
Scope: ESC, Strip topsoil and overburden, Asphalt parking lot, bulk excavation and backfill, Detail excavation and backfill, building area slab (gravel base, interior turf), indoor turf sub-base, building trenching/bedding and backfill, site utilities (storm, sani, water)

The post LSAP Early Works Earthworks and Utilities appeared first on TYBO Contracting Ltd..

]]>