Unitech https://unitecheg.com Building amazing Wed, 04 Sep 2024 13:47:43 +0000 en-US hourly 1 https://wordpress.org/?v=6.9.4 https://unitecheg.com/wp-content/uploads/2022/03/cropped-Unitech-Logo-Sticky-Header-32x32.png Unitech https://unitecheg.com 32 32 ISCC Power Plant https://unitecheg.com/electrical-control-building-iscc-power-plant-kurymat/ Sun, 21 Apr 2024 13:04:40 +0000 https://unitecheg.com/?p=11201

Electrical & Control Building ISCC Power Plant- Kurymat

Chilled Water System 1500TR, Fire Fighting System

Start Year

May 2009

Industry

Infrastructure

Sector

MEP

Country

Egypt

Consultant

Iberdrola

Execution Status

Accomplished

]]>
Mars Egypt Site Development Project https://unitecheg.com/mars-egypt-site-development-project/ Sun, 21 Apr 2024 12:56:03 +0000 https://unitecheg.com/?p=11177

Mars Egypt Site Development Project

Water Cooled Ammonia Chillers 1240TR

Start Year

July. 2013

Industry

Administrative Buildings

Sector

MEP

Country

Egypt

Consultant

Engineering Consultants Group
ECG

Execution Status

Accomplished

]]>
Global Heart Hospital https://unitecheg.com/sir-magdy-yacoub-global-heart-hospital/ Sun, 21 Apr 2024 12:12:18 +0000 https://unitecheg.com/?p=11098

Sir Magdy Yacoub Global Heart Hospital

Chilled Water System 461G3:G160TR

Start Year

Nov. 2021

Industry

Medical

Sector

MEP

Country

Egypt

Execution Status

Under Construction

Consultant

EHAF

Leading Healthcare Construction: LEED-Certified Magdi Yacoub Global Heart Centre

Unitech Contractors proudly announces our role in the Magdi Yacoub Global Heart Centre (MYGHC) in Cairo, a testament to our commitment to pioneering healthcare infrastructure. Located in the vibrant 6th of October City, this project not only demonstrates our construction expertise but also our dedication to advancing healthcare through innovative and sustainable facilities.

Innovative Construction for Healthcare Excellence: The MYGHC project, sprawling over 35 acres, stands as a cornerstone of advanced cardiovascular care, designed to serve over 12,000 patients annually. Our collaboration with leading industry figures has been pivotal in constructing a 300-bed facility equipped to manage over 80,000 outpatient visits each year, showcasing our ability to execute large-scale, impactful construction projects with finesse and innovation.

Sustainable Design and Cutting-Edge Facilities: Our efforts extend to the development of state-of-the-art medical facilities, including advanced operating theatres and cath labs, embracing the visionary designs of Foster and Partners and Dar Al-Handasah. This project emphasizes patient-centered care within an environmentally sustainable framework, earning the prestigious LEED certification for green building practices.

A Hub for Innovation and Research: More than constructing medical facilities, our role in establishing an integrated research and innovation hub within MYGHC underscores our investment in supporting future advancements in cardiovascular medicine. This aligns with our mission to back projects with a significant impact on global health outcomes.

Participating in the development of the Magdi Yacoub Global Heart Centre marks a significant milestone for Unitech Contractors, reflecting our deep-seated commitment to meaningful projects. It showcases our expertise in construction and solidifies our contribution to the future of healthcare infrastructure in Egypt. Join us in our journey towards building a healthier, hopeful future.

]]>
Jaz Oriental Hotel Ras Hewala Marsa Matrouh https://unitecheg.com/jaz-oriental-hotel-ras-hewala-marsa-matrouh/ Wed, 17 Apr 2024 11:15:22 +0000 https://unitecheg.com/?p=10999

Jaz Oriental Hotel Ras Hewala Marsa Matrouh

Ventilation For Main Building

Start Year

Jan. 2009

Industry

Hospitality

Sector

MEP

Country

Egypt

Consultant

R&A Design Team Eng.
Adel Sedky

Execution Status

Accomplished

]]>
Grand Hospital Cairo https://unitecheg.com/grand-hospital-cairo/ Wed, 17 Apr 2024 11:12:15 +0000 https://unitecheg.com/?p=10943

Grand Hospital Cairo

HVAC & Fire Fighting System

Start Year

Oct. 2020

Industry

Medical

Sector

MEP

Country

Egypt

Consultant

Shaker Consultancy Engineering Consultants Group
ECG

Execution Status

Accomplished

]]>
TOLIP Golden Plaza https://unitecheg.com/tolip-golden-plaza/ Wed, 17 Apr 2024 11:08:56 +0000 https://unitecheg.com/?p=10934

TOLIP Golden Plaza

Fire Fighting System

Start Year

Jan. 2016

Industry

Hospitality

Sector

MEP

Country

Egypt

Consultant

 Engineering Consultants Group
ECG

Execution Status

Accomplished 

]]>
Goethe Institute and German Academic Exchange Service (DAAD) https://unitecheg.com/goethe-institute-and-german-academic-exchange-service-daad/ Wed, 17 Apr 2024 11:06:36 +0000 https://unitecheg.com/?p=10923

Goethe Institute and German Academic Exchange Service (DAAD)

Central VRV System, Ventilation 95 TR, Plumbing & Fire Fighting System

Start Year

Apr. 2013

Industry

University, Schools & Cultural Centers

Sector

MEP

Country

Egypt

Execution Status

Accomplished

Consultant

HPI HIMMEN

Goethe-Institute Project, Cairo: A Modern Tribute to Cultural Heritage

At Unitech Contractors, we are proud to spotlight the Goethe-Institute Project in Cairo as a hallmark of our commitment to merging historical integrity with modern innovation. This project, situated in the bustling heart of Cairo’s Dokki district, exemplifies our expertise in integrating modern educational and cultural facilities within a historic villa, showcasing a seamless blend of the old and the new.

Project Insights: Embarking on the Goethe-Institute Project, we embraced the challenge of constructing an educational and cultural hub that respects its historical context. Our role in erecting new buildings for the Institute—to accommodate language education, cultural programs, and administrative functions—demanded a nuanced approach to preservation and innovation.

Navigating Challenges: The political landscape and logistical hurdles in Egypt posed unique challenges, from securing materials to adhering to local regulations. Our team, in collaboration with local and international partners, leveraged meticulous planning and innovative strategies to overcome these obstacles, demonstrating our adaptability and commitment to project excellence.

Environmental and Cultural Integration: A focal point of our work was the environmental sustainability of the project. By innovatively utilizing the Nile’s proximity, we devised a sustainable solution for the institute’s cooling needs, significantly reducing its energy consumption and setting a precedent for environmentally conscious construction practices. This initiative, alongside our efforts to preserve the site’s extensive gardens and historical essence, highlights our dedication to sustainability and cultural respect.

The Goethe-Institute Project stands as a testament to Unitech Contractors’ capabilities in delivering complex construction projects that honor Egypt’s rich cultural heritage while embracing modernity. Our involvement in this transformative project underscores our position as industry leaders, committed to excellence, innovation, and the thoughtful integration of environmental and cultural values.

Discover how Unitech Contractors is shaping the future of construction by exploring our diverse portfolio of projects, each embodying our core values of quality, innovation, and respect for heritage.

]]>
Giza Palace Hotel https://unitecheg.com/giza-palace-hotel/ Wed, 17 Apr 2024 11:00:02 +0000 https://unitecheg.com/?p=10914

Giza Palace Hotel

Chilled Water System 3200TR & Electrical Works

Start Year

Dec. 2018

Industry

Hospitality

Sector

MEP

Country

Egypt

Execution Status

Under Construction

Consultant

EMG

Giza Palace Hotel

Unitech Contractors takes immense pride in our role within the construction of the Giza Palace Hotel, a landmark that exemplifies our excellence and innovation in the construction sector. Located in the vibrant area of Cairo West, the Giza Palace Hotel merges luxury with architectural grandeur, showcasing our comprehensive construction capabilities.

Covering an extensive area of 33,412 m2, the Giza Palace Hotel is a marvel of modern hospitality, boasting over 500 luxurious rooms and apartments, a majestic lobby, a rejuvenating spa, and an exclusive shopping mall spread across 3,300 m2. With additional features like tranquil pool areas, spacious banquet halls, extensive parking facilities, and diverse dining options, the project highlights our attention to detail and operational proficiency.

Our contribution to the Giza Palace Hotel reflects a harmonious blend of traditional Arabic design and contemporary luxury, demonstrating our meticulous approach to preserving cultural heritage while embracing modern aesthetics. This project underlines Unitech Contractors’ commitment to delivering high-quality, innovative, and impactful construction projects, further cementing our position as leaders in Egypt’s hospitality industry.

]]>
Galleria Moon Valley https://unitecheg.com/galleria-moon-valley/ Wed, 17 Apr 2024 10:54:42 +0000 https://unitecheg.com/?p=10898

Galleria Moon Valley

Electrical with capacity 200KVA & Light Current System

Start Year

Industry

Sep. 2017

Mixed used

Sector

MEP

Country

Egypt

Consultant

Arabian Construction Company
ACC

Execution Status

Accomplished

]]>
Ezz Flat Steel Bar mill #1,2 Ain Sukhna, Suez – Egypt https://unitecheg.com/ezz-flat-steel-bar-mill-12-ain-sukhna-suez-egypt/ Wed, 17 Apr 2024 10:52:08 +0000 https://unitecheg.com/?p=10890

Ezz Flat Steel Bar mill #1,2 Ain Sukhna, Suez – Egypt

Central DX Water Cooled System 360TR

Start Year

Aug. 2010

Industry

Industrial

Sector

HVAC

Country

Egypt

Consultant

EMDEG

Execution Status

Accomplished

]]>