Elice Brand Logo
AI PMDC

AI-dedicated modular data center delivered in 12 weeks

From hardware to software, a full-stack AI solution
Contact

Asia's first liquid-cooled B200 data center, Elice AI PMDC

Ready in 12 Weeks

From design to installation in just 12 weeks Start AI training immediately without GPU procurement delays

Up to 640kW+ Scalability

Large-scale GPU cluster operation Handle training and inference for large models at once

PUE 1.1 Ultra-High Efficiency

35% power savings compared to standard data centers (PUE 1.7)

Up to 50% Cost Savings

No upfront CAPEX required Pay only for the AI infrastructure you need

Flexible data centers without compromising performance

General Data Center
36-48 month construction period

Long timelines for design, bidding, and construction

High upfront construction costs

Requires large-scale CAPEX investment

Average PUE 1.7

High energy waste structure

GPU scaling constraints

General cooling limits high-density GPU heat, requiring redesign for next-gen GPUs

InfiniBand-only configuration

Vendor lock-in and increased cost burden

Certification and security burden

Difficult to meet AI-specialized infrastructure and security certification simultaneously

Elice AI PMDC
Ready in 12 weeks

Portable modular design for rapid infrastructure deployment

Up to 50% cost savings

Flexible infrastructure without upfront investment

PUE below 1.1

High-density power design, up to 1.2MW IT power

High-density AI compute optimization

Cooling design capable of handling ultra-high-power GPUs like NVL72

InfiniBand + RoCE dual support

Choose the right network for your workload and budget

CSAP + ISO certified

Ready for public and financial sector workloads

Data center architecture that determines AI performance

Optimal infrastructure for high-performance AI, from space to power to cooling
PMDC Data center
Space

Integrated configuration from servers, GPU/NPU, network, power, to cooling


Up to 8x GPU density per unit area

High-density structure for more AI servers


AI workload optimized deployment

Server configuration considering training and inference efficiency


Modular expansion structure

Flexible capacity scaling when needed


Maximized space efficiency

Reduced installation footprint vs. traditional data centers

Power

Up to 80kW high-density power per rack

Stable operation of latest GPU/NPU


Up to 1.2MW IT power supply

*Based on GB300, stable operation of large-scale GPU clusters


Over 20% power efficiency savings with liquid cooling (15kWh → 12kWh)


Up to 8,192 GPU scaling support

High-performance AI training and inference environment

Cooling

Liquid/air-cooled selectable cooling system

Flexible design tailored to environment and budget


PUE 1.1 level high-efficiency cooling

Improved energy efficiency compared to conventional systems


Optimal GPU temperature stabilization

No performance degradation even under heavy loads


High-density environment cooling system

Stable operation of high-power GPU clusters

Choose the AI infrastructure that fits your goals

From standalone infrastructure to integrated AI operations, flexibly configure to match your needs.
AI PMDC standalone

High-performance AI infrastructure chosen to match your operational goals

Model training

PMDC-R6-480-DLC

liquid-cooling

Max IT Load 480kW

Cluster-scale

4 x PMDC-R6-480-DLC

liquid-cooling

Max IT Load 1.92MW

Inference or mixed use

PMDC-R6-240-AC

air-cooling

Max IT Load 240kW

PMDC-HYBRID

Container options combination and customization available

Contact sales for AI PMDC
AI PMDC + ECI integrated solution
Recommended

An integrated solution for flexibly scaling large-scale AI resources

PMDC Hardware

AI workload-optimized containerized modular data center AI

ECI Software

Cloud IaaS platform for AI infrastructure operations

GPU/NPU optimized VMs

Virtualize and utilize high-performance resources without performance degradation

Multi-tenant security isolation

Minimize security concerns with complete data separation

IaC tool integration

Support for automation environments including Terraform, OpenAPI

Turnkey solution

Integrated environment ready for operation immediately after PMDC installation

Support for various scale clustering

Stable scaling support in Infiniband, RoCEv2 environments

Learn more ECI
Contact sales for PMDC + ECI

PMDC solution built and proven in-house

AI PMDC, the foundation of Elice's full-stack AI solution
AI PMDC Solution 1

Elice internal deployment case

GPUaaS solution built in 4 months

Launched GPUaaS services immediately after building an H100-based AI PMDC. Provides a structure for rapid transition from design to operations in a single environment.

Construction period: 4 months (July-October 2024)

Configuration : H100-based PMDC container

Results : GPU cloud service operation immediately after deployment

"From deployment to operation in just 4 months. Completed AI infrastructure at 1/3 the time and cost compared to traditional DC."
Elice LogoElice Infrastructure Team

Elice AI infrastructure built with global tech leaders

Partner 1
MOU signed for AI PMDC construction
Partner 2
NVIDIA Deep Learning Institute (DLI) official education service partnership
Partner 3
Strategic cooperation MOU signed for the activation of the domestic AI semiconductor ecosystem
Partner 4
Joint development partnership established for next-generation AI PMDC and cloud solutions

From public agencies to enterprises, cloud infrastructure you can trust

CSAP certified

Meets mandatory requirements for public sector adoption Ready for immediate deployment without additional security review

*For CSAP details, visit gov.elice.cloud or contact our sales team
Global standard security management

ISO 27001/27701 certified - International verification of security and privacy management systems

Proven operational expertise

Proven through government-led AI foundation model projects, NPU farm construction, and large-scale service operations

Certification 1
Certification 2
Certification 3

Start your scalable AI journey with AI PMDC

Contact